October 1, 2003

Harnessing the reflective quality of Celetex

It's 5:30am. Dark. I'm in a trench, scraping loose dirt from compacted dirt, attempting to make this dirt hole as clean as possible; kind of ironic.

Continue reading "Harnessing the reflective quality of Celetex" »

October 2, 2003

Footings Poured!!!!

So we're having breakfast at 7:20 this morning when we get a call. It's HandyMan Concrete and they already have a truck on site!

We sped off, coffee and tea in hand, and began our day at Hearthwood. Our first driver, Emir, was a nice fellow and a good judge of how wet the mix needed to be. He dumped our first five yards of concrete and we were on to the next truck.

Continue reading "Footings Poured!!!!" »

October 3, 2003

TJI's

Yesterday, after the footing pour, we went to a construction place in Manassas, Bull Run Supply or something like that. Jean has been working with a good guy, Mike Patterson, to get our Trus-Joist order for our dome. He had his TJI rep out yesterday, so we sat down, worked out all the details and we ought to be able to order today!

**FYI, all construction photos and videos are now available, not only in daily logs, but also on the construction photos page and videos page. Enjoy!

October 4, 2003

Par for the course...of block

Today we laid the one course of 8" block necessary to bring the footers up to grade. Laying block would have been simple enough, but we had to make sure the corner points of the sil plates, ie the base of our walls, were at the correct points.
Take a 10-sided house (decahedron), attempt to get the corner points 19' 6" from the center, and try to line the things up on footers you've semi-professionally poured and it takes about two hours. To get the points right.

Continue reading "Par for the course...of block" »

October 5, 2003

I'm too tired to think of a clever title

Today Jean, Dad and I did a lot. Yeah.

This morning, Jean and I went to Home Despot to pick up 55 8"x8"x16" block to finish up the interior weight bearing footings. We also picked up the 6 mm vapor barrier for the concrete pad. A couple hours later, we made it back to Hearthwood and began laying block.

Continue reading "I'm too tired to think of a clever title" »

October 8, 2003

Plumbing in the slab!

Yesterday the plumber put the basement plumbing in the foundation, and Jean and Charlie spread some more gravel. And then the concrete finisher came to look at the site.

Continue reading "Plumbing in the slab!" »

October 9, 2003

Slab inspected

Jeano met the inspector this morning and our slab passed inspection. She ordered our interior framing lumber for our basement from the lumber place and confirmed delivery of it Friday, and our windows on the 23rd.

She's also ordered our wood stoves, which should arrive in a few weeks.

I scanned in updated schematics of our plans and have added a few other things to the construction section of the site. Check it out!

October 10, 2003

Slab Poured!

Jeano was the real deal today. She alone, directed the concrete trucks and finishing crew to finish the dome slab. Ok, so she really just said "Go!" and they did their job, but she did a really good job of filming for an 8-month pregnant wife! And they did a good job at that...

Continue reading "Slab Poured!" »

October 12, 2003

Basement Walls Are Up!

We just want to let everyone who came out to help us today, that you were SO MUCH HELP!!! We couldn't have done it without you.

Today, we put the basement walls up. Marsha, Jake, Josh, Laura, Jo, Kathy and Bob all helped Jean and I maneuver these enormous wall sections of mostly pressure treated lumber, into place.

My grandmother and grandfather Lampkin are even in town and got to stop by. My grandfather, a real computer buff, should be emailing us some digital photos within a week or so, so continue to check the Construction Photos "foundation" page:)

Continue reading "Basement Walls Are Up!" »

Framing

From the mouth o' Jeano: "Sunday morning Marsha and Josh came out again, and Krissy came out to help, too. Marsha and Josh shared the miserable job of screwing in the bolts that bolted the walls to the base plate. It was a slow going loud process with the compressor running the drill. My shoulders ache for them, being hunched over a power drill for hours. (shudder)

Continue reading "Framing" »

October 20, 2003

Floor joists in; We're almost at dome raising!

I can't believe it. We have all of our basement framing done and most of our floor joists in.

On this recent crisp fall Saturday morning, Jean's brother Robert was singing "Tainted Love" while sawing 2x6 studs for our basement.

By the time 9 o'clock rolled around, Mom, Dad, Josh, Justin, Chris, John, and a load of other people throughout the day showed up.

Continue reading "Floor joists in; We're almost at dome raising!" »

October 21, 2003

Well, Well, Well...

That's right. A well. Yesterday morning, Groundwater Inc. called Jean to say they were coming out to the site. She went out to meet them, supposing they were sending a crew to spec out the site and see what needed to be cleared.

Imagine her surprise when the well drilling rig showed up! Robert cleared the necessary area with the back-hoe and they began drilling! They should finish up today, and our health dept. inspector will be there to witness the "grouting of the well," whatever that is.

Continue reading "Well, Well, Well..." »

October 22, 2003

Subfloor work

I'm taking the rest of this week off to prepare for dome raising. This morning Robert and I began finishing up the joists this morning, interspersed with work on the subfloor.

Jean took care of some higher level Hearthwood business and bought us more joist hangers.

Continue reading "Subfloor work" »

October 24, 2003

Subfloor complete, Dome Raising Imminent

Yesterday and today, Robert, Bob, Dad and I worked tirelessly to finish the first and second layers of plywood for the subfloor.

Yesterday Robert and I got a decent start out in the morning, and had made decent headway by lunch. Lunch was chinese food courtesy of Jean - extremely welcome on that cold and windy day. It never got above 55 degrees or so, and was much colder with the clouds and wind chill. Brrrr.

The afternoon brough a little more sun and Bob came out to help us glue and screw (ha ha - a rhyme) the plywood down. By the end of the day, we had two rows of the 1/2 inch stuff down.

Continue reading "Subfloor complete, Dome Raising Imminent" »

October 25, 2003

The Dome is Up!

Incredibly, our dome is up. Thanks to all the friends and family who came out, from those who stayed for every last minute, grunting triangles into place, to those who weren't even able to make it out but thought about us. You all made this possible.

Lucas isn't coming yet, but stay tuned during the next couple weeks. He's still officially due November 9th. :)

We're too tired to even think about more tonight, but we'll throw up some photos Sunday evening, and have a more descriptive entry.

For those of you coming out tomorrow, we're more than happy to have you. More than enough to do...Until then, don't forget to set you clocks ba...Zzzzzz.

October 26, 2003

Dome Raising in detail

Hey everybody! I'd just like to say again just how thankful we are that we had such a great turnout for our domeraising. You'd think we had free beer or something!

For those of you who were there, this is review, but for those who weren't let the story unfold...

Around 7:30 in the morning, Jean, myself, and Phillipson/Dyer crew arrive. We started finding the riser walls and moving them into position. The excitement was compounded by Jean having possible delivery signs.

Continue reading "Dome Raising in detail" »

About October 2003

This page contains all entries posted to Hearthwood Dome in October 2003. They are listed from oldest to newest.

September 2003 is the previous archive.

November 2003 is the next archive.

Many more can be found on the main index page or by looking through the archives.

Creative Commons License
This weblog is licensed under a Creative Commons License.